Energy and EmergenciesH.R. 3632Comments

Power Plant Reliability Act of 2025

Official title: To amend the Federal Power Act to adjust the requirements for orders, rules, and regulations relating to furnishing adequate service, to require owners or operators of generating facilities to provide notice of planned retirements of certain electric generating units, and for other purposes.

What Do You Think?

How would you vote?

Referandom Vote

Vote to see the result.

Where the Bill Stands

  1. Introduced, done
  2. Committee, done
  3. Floor Vote, done
  4. Outcome, current stage

How Congress Voted

Vote to see the result ↑

What This Bill Does

This bill modifies the process that the Federal Energy Regulatory Commission (FERC) uses to determine, upon a complaint from a state commission, whether a public utility (i.e., power plant) must remain open because the retirement of the power plant will make the bulk power system unreliable, including by allowing transmission organizations to also file complaints with FERC.

If FERC finds that any interstate service of any public utility is inadequate or insufficient, or is likely to become inadequate or insufficient within five years of receiving such complaint, then FERC must determine the proper, adequate, or sufficient service to be furnished through an order, rule, or regulation (order).

The bill specifies that FERC may order a power plant to remain open for up to five years. Any affected state commission, transmission organization, or power plant may request that FERC extend such order.

A FERC order must determine (1) any rate or charge necessary to provide compensation for the additional costs of the service, and (2) the cost allocation of any rate or charge.

A power plant owner or operator must notify FERC and affected state commissions or transmission organizations at least five years before any planned retirement of a unit of an electric generating facility except in the case of an emergency or similar event that renders a unit inoperable.

The bill exempts from federal, state, and local environmental laws and regulations any action taken by a generating facility to comply with such orders.

Sponsors

Related Documents

Timeline

  1. SenateReceived in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.
  2. House floor actionsRules Committee Resolution H. Res. 951 Reported to House. Rule provides for consideration of H.R. 4776, H.R. 1366, H.R. 845, H.R. 3616, H.R. 3632 and H.R. 4371. The resolution provides for consideration of H.R. 4776, under a structured rule and H.R. 1366, H.R. 845, H.R. 3616, H.R. 3632, and H.R. 4371 under a closed rule. The resolution provides one motion to recommit on each bill.
  3. Floor Vote
  4. Passed the House
  5. House floor actionsSupplemental report filed by the Committee on Energy and Commerce, H. Rept. 119-307, Part II.
  6. House floor actionsReported by the Committee on Energy and Commerce. H. Rept. 119-307.
  7. House committee actionsCommittee Consideration and Mark-up Session Held
  8. House committee actionsSubcommittee Consideration and Mark-up Session Held
  9. House committee actionsReferred to the Subcommittee on Energy.
  10. Library of CongressIntroduced in House
  11. House floor actionsReferred to the House Committee on Energy and Commerce.
  12. Introduced
  13. Committee