Skip to Content

Do you allow analytics?

We use analytics tools to understand how people use the site. They're optional: if you decline, the site works the same, no analytics cookies are set and Google gets only a cookieless, anonymous count signal. Your votes are saved either way; the details are in the privacy policy.

Referandom is here: Tinder for Congress 🔥

Support Referandom
Energy and EmergenciesH.R. 6633Comments

High-Capacity Grid Act

Official title: To establish a best-available transmission conductor standard for certain transmission projects under the Federal Power Act and to provide for presumptions regarding cost recovery for such conductors.

What Do You Think?

How would you vote?

Referandom Vote

Vote to see the result.

Where the Bill Stands

  1. Introduced, done
  2. Committee, done
  3. Floor Vote, done
  4. Outcome, current stage

What This Bill Does

This bill requires public electric utilities to use the best-available transmission conductor for certain interstate transmission lines (i.e., power lines) in order to recover the costs of the conductor through consumers' electric bills.

Specifically, in any filing seeking to recover the costs of a transmission conductor for the transmission line and in any proceeding to determine if the costs may be recovered through rates, the bill directs the Federal Energy Regulatory Commission to presume that (1) the use of a best-available transmission conductor is a prudent practice and that the associated costs are just and reasonable, and (2) the use of a transmission conductor that is not a best-available transmission conductor is not prudent and that the associated costs are not just and reasonable.

A best-available transmission conductor is a conductor that (1) provides the greatest feasible and commercially available energy-carrying capacity at a given voltage level, (2) provides the highest feasible and commercially available electrical efficiency at that voltage level, and (3) mitigates thermal sag (drooping of power lines) at the maximum rated transmission-carrying capacity of the facility.

The bill applies to projects to (1) construct new transmission facilities; or (2) modify, upgrade, or replace an existing transmission line.

Sponsors

Related Documents

Timeline

  1. SenateReceived in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.
  2. House floor actionsMr. Guthrie moved to suspend the rules and pass the bill, as amended.
  3. Library of CongressPassed/agreed to in House: On motion to suspend the rules and pass the bill, as amended Agreed to by voice vote.
  4. Floor Vote
  5. Passed the House
  6. House floor actionsReported (Amended) by the Committee on Energy and Commerce. H. Rept. 119-824.
  7. House committee actionsCommittee Consideration and Mark-up Session Held
  8. House committee actionsCommittee Consideration and Mark-up Session Held
  9. House committee actionsSubcommittee Consideration and Mark-up Session Held
  10. Library of CongressIntroduced in House
  11. House committee actionsReferred to the Subcommittee on Energy.
  12. House floor actionsReferred to the House Committee on Energy and Commerce.
  13. Introduced
  14. Committee

Comments

Comments with insults, hate speech or personal information are removed.