State Planning for Reliability and Affordability Act

Official title: To amend the Public Utility Regulatory Policies Act of 1978 to add a standard related to State consideration of reliable generation, and for other purposes.

What Do You Think?

How would you vote?

Referandom Vote

Vote to see the result.

Where the Bill Stands

  1. Introduced, done
  2. Committee, done
  3. Floor Vote, done
  4. Outcome, current stage

How Congress Voted

Vote to see the result ↑

What This Bill Does

This bill requires certain state authorities that regulate electric utilities to consider the establishment of measures regarding the reliable availability of electricity over specified time periods. These requirements would apply to electric utilities that use integrated resource plans, plans that project future electricity use to ensure resource adequacy, as opposed to utilities that rely on capacity markets, which use price trends for resource planning.

Specifically, the state authorities must consider requiring the integrated resource plans of electric utilities to include measures to ensure the reliable availability of electric energy over a 10-year period to maintain the operation of reliable generation facilities or the procurement of electric energy from reliable generation facilities.

The bill defines reliable generation facilities as facilities that

  • enable the generation of electric energy on a continuous basis over a period of not fewer than 30 days;
  • have adequate fuel or a continuously available energy source on-site to enable the continuous generation of electric energy for at least 30 days, or have contractual obligations that achieve the same;
  • have operational characteristics to enable the generation of electric energy during emergency and severe weather conditions; and
  • provide services such as frequency support and voltage support.

Sponsors

Related Documents

Timeline

  1. SenateReceived in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.
  2. House floor actionsConsidered as unfinished business. (consideration: CR H5789)
  3. Floor Vote
  4. Passed the House
  5. House floor actionsConsidered under the provisions of rule H. Res. 936. (consideration: CR H5522-5528; text: CR H5522-5523)
  6. House floor actionsRules Committee Resolution H. Res. 936 Reported to House. Rule provides for consideration of H.R. 3898, H.R. 3383, H.R. 3638, H.R. 3628, H.R. 3668 and S. 1071. The resolution provides for consideration of H.R. 3898, H.R. 3383, H.R. 3638, and H.R. 3628 under a structured rule; and H.R. 3668 and S. 1071 under a closed rule. The resolution provides for one motion to recommit on H.R. 3898, H.R. 3383, H.R. 3638, H.R. 3628, and H.R. 3668; and one motion to commit on S. 1071.
  7. House floor actionsReported by the Committee on Energy and Commerce. H. Rept. 119-306.
  8. House committee actionsCommittee Consideration and Mark-up Session Held
  9. House committee actionsSubcommittee Consideration and Mark-up Session Held
  10. House committee actionsReferred to the Subcommittee on Energy.
  11. Library of CongressIntroduced in House
  12. House floor actionsReferred to the House Committee on Energy and Commerce.
  13. Introduced
  14. Committee

Comments

Comments with insults, hate speech or personal information are removed.